Dryburn Footbridge Replacement - PROW 302146

Buyer
Westmorland and Furness Council
Value
£300,000
Closes
7 January 2027
Where
Kendal, the North West
Type
Open tender

In plain English

The council wants a new 34 metre footbridge with two spans over the South Tyne River, on the Pennine Way footpath near Garrigill in the North Pennines. The estimated value is £300,000, and the work must be built to National Trails standards and designed to withstand flash flooding. Construction is planned to start after 1 April 2028, subject to funding.

What the buyer wants

• Design the bridge in full and obtain all the consents, permits and orders needed before construction can begin (Stage 1) • Build the bridge at a minimum walking width of 1.2 metres, with river piers designed for frequent flash flooding, to National Trails Quality Standards (Stage 2) • Plan the river work around the in-river working window of 16 June to 30 September, where required

Requirements

What could rule a small business out: The contractor must take on full bridge design, secure all consents and build a river structure in a remote location within a fixed working window, so a small firm without in-house design capability or a partner able to carry that design responsibility would most likely be ruled out.

Always check the tender documents.

How to bid

This is an open tender: any eligible business can respond directly to the buyer by the deadline, with no framework membership needed.

Where to apply

Bids go through The Chest. Make a free account there, then search for this tender's title.

Go to The Chest

Questions about this tender? Email the buyer at Procurement.Mailbox.WAF@Cumbria.gov.uk.

How to write a tender response

More open tenders from Westmorland and Furness Council

Similar open construction contracts

Check whether your business could win this, free

Get a plain-English bid plan for this tender with the bid coach

More construction contracts in the North West